FF BuildersFF Builders
Renovated classroom with a new floor, LED ceiling lights and a whiteboard wall
Pinecrest · Campuses · Summer schedule

Private school renovation
in Pinecrest.

Schools are a big part of why families choose Pinecrest, and the campuses in and around the Village sit on wide, wooded grounds with low buildings. We renovate them on a summer clock, priced in writing within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

A campus is spread out.

A school in a city block works out of one building. A campus around Pinecrest is often several low buildings added one at a time over the decades, connected by covered walkways under old trees. A summer renovation here is as much about moving crews and material across the grounds as it is about the rooms. The visit happens during the school year so the summer is spent building.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We walk the campus during the yearEach building, the roofs, the windows, the walkways, the trees and where a dumpster and deliveries can go.
  3. You get the estimate in writing, within 24 hoursBuilding by building, with what fits in the summer, what waits for the next break and permits.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we renovate in Pinecrest

Every building, ready for the first bell.

Classrooms

Floors, ceilings, lighting and whiteboard walls.

Restrooms

Fixtures, partitions and accessible stalls.

Windows

Impact units replacing original aluminum frames.

Offices and admissions

The front desk families see on a tour.

Common rooms

Cafeterias, libraries and gathering spaces.

Paint and finishes

Every room touched, in one pass.

Classroom stripped during summer break while a crew installs a new ceiling grid

What a wooded campus adds

Under the oaks,
on a deadline.

The shade is what parents remember from the tour, and it is what the crew has to work around. Mature oaks and mahoganies over the walkways decide where a dumpster can sit, where a lift can reach a window and where trucks can drive without crushing roots. The Village regulates tree removal, so none of that is solved by taking a tree down. We map the canopy and the access routes during the year, so the summer starts with a plan for every building.

The buildings themselves tell their age the same way many Pinecrest houses do: long, low, with shallow roofs and original aluminum windows. That makes window replacement one of the most common summer jobs, and one of the most useful, since the same storms that drop branches on the roofs test the glass. Windows are measured in the spring and ordered early, because a late delivery is the easiest way to lose August.

Inside, low buildings hide their surprises above the ceilings and in the slab: old wiring, patched plumbing, and in some older parts of a campus a connection to a septic system rather than the sewer, which matters if you are adding restrooms. We look before the break, split the scope into what fits this summer and what waits, and close the permits with the Village before teachers come back.

What's in the price

Summer work,
finished by the first day.

The job is done when teachers can set up their rooms, not when the crew leaves.

  • Campus walk — during the year, building by building
  • Access and canopy plan — dumpster, deliveries and trees mapped
  • Phased scope — what fits this summer, what waits
  • Windows ordered early — measured in spring
  • Classroom finishes — floors, ceilings, lighting and paint
  • Permits and inspections — closed before teachers return

What separates school contractors here

The truck has to reach
the building first.

On a wooded campus, a contractor who plans the rooms and not the route spends July waiting for access. Around Pinecrest the grounds are part of the schedule, and so is every tree along the way.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Can you finish over one summer?

That depends on the scope and the campus. We walk it during the year and split the work into what fits the summer and what waits, so the date you get is one you can hold.

Can you work around the trees on our campus?

Yes. Tree removal in Pinecrest is regulated by the Village, so we plan dumpsters, deliveries and lifts around the canopy and keep heavy equipment off the root zones.

Can you replace the original windows?

Yes. Impact windows are one of the most common summer jobs on older campuses here. They are measured early and ordered in time for the break.

Can you work while school is in session?

For some work, yes, after hours and in closed-off areas. Most classroom work is done during breaks.

How much does a school renovation cost?

It depends on the number of buildings, rooms and the scope. You get a written estimate within 24 hours of the visit.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Pinecrest

One contractor for the whole property.

FF Builders is a Florida Certified General Contractor working across Pinecrest, from the original ranch houses to new homes on the big lots. Kitchens, baths, additions, windows and outdoor work are the same company, with one person answering the phone from the first visit to the final inspection.

Private school renovation · General contractor in Pinecrest · Daycare build-out in Pinecrest · Commercial impact windows in Pinecrest · ADA upgrades in Pinecrest · Private school renovation in Coral Gables · Private school renovation in South Miami · Private school renovation in Coconut Grove

Free in-home visit

Your campus, renovated over the summer.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.