We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

On a canal lot the yard is already spoken for: the house in front, the pool and deck behind it, the dock at the water. When the family needs more rooms, the only direction left is up, and a second floor also gives you a view down the canal. Whether your house can carry it is a question for the engineer and the City. We start there.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
Most one-story houses here were designed for one roof, not for a floor of bedrooms on top. On the visit we look at the block walls, the tie beam, what can be seen of the foundation, the roof trusses that would come off, and where a stair could land without cutting the house in half. On the canal side we look closer: salt air may have rusted the steel in the tie beam or the straps, and that has to be found before new weight goes on it. Then an engineer confirms what the structure can take. Check with the City before anyone draws the new floor.
What we build in Lighthouse Point
Footings strengthened where the engineer's design calls for it to carry the new load.
New walls tied into the existing structure, with straps and connections to the engineer's design.
The old trusses removed and a new roof built over the second floor.
Openings for the new floor rated for hurricane wind, with frames chosen for salt air.
The stair, bedrooms, baths and closets finished to the standard of the house below.

What changes in Lighthouse Point
A second floor on a canal house takes the weather differently from the floor below it. The upper walls and windows face open water with nothing in between, so the wind load on the canal side is higher, and the salt reaches further up the wall. The engineer sizes the new connections for hurricane wind, and we specify the windows, frames, fasteners and exterior coatings on the water side for coastal exposure. The room you add for the view is also the room most exposed to the weather, and it is built that way.
Then the flood question. If the property is in a flood zone, a second story is counted with everything else you do to the house, and a project whose cost passes 50% of the structure's value can require the whole house, including the ground floor, to meet current flood requirements. On an older, low house that can change the plan entirely. Check with the City on your address before the design is final; we price the addition with that answer in it, and next to a rebuild when it gets close.
Last, the logistics. The back of the lot is water, so the crane, the trusses and the block all come from the street, and the pool, deck and dock stay protected. The roof comes off in stages and the house is dried in before the afternoon rain. The City's plan review and inspections follow the engineering through each stage.
What's in the price
The engineering, the permit, the structure, the roof and the new rooms on one schedule, with one person who knows where every piece stands.
What separates builders here
A second floor added over hidden salt damage, or not sized for open-water wind, waits for the first storm.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you hire anyone
Many can, with reinforcement. An engineer checks the walls, tie beam and foundation first. We price the reinforcement and the addition as one job once the engineer confirms what the structure can take.
It can, if the property is in a flood zone. The addition counts toward the improvement, and passing 50% of the structure's value can require the whole house to meet current flood requirements. Check with the City on your address.
Usually that is the point. We plan the rooms and the windows around the view, with impact glass rated for the wind that comes off the water.
Often, for most of it. The roof comes off in stages and the ground floor is protected, but there are days when the house should be empty. We tell you which ones in writing.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.
More in Lighthouse Point
FF Builders is a Florida Certified General Contractor working across Lighthouse Point, from the homes on the canals to the condos and storefronts on Federal Highway. Kitchens, baths, impact glass, additions and build-outs are the same company, with one person answering the phone from the first visit to the final inspection.
Second story additions · General contractor in Lighthouse Point · Home remodeling in Lighthouse Point · Primary suite additions in Lighthouse Point · Home additions in Lighthouse Point · Teardown and rebuild in Lighthouse Point · Second story additions in Hillsboro Beach · Second story additions in Lauderdale-by-the-Sea
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).