We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

Salt air eats railings and the concrete they are anchored to. We replace them with the slab edge repaired first, so the new railing has something solid to hold.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
Most railing failures start where the post enters the slab. The visit checks the railings, the anchors and the slab edges on a sample of balconies before pricing.
What we replace
Old corroded railings taken out safely.
Spalled concrete and rusted steel repaired.
Picket or glass infill, powder-coated.
Clear glass panels in aluminum frames.
Done while the balcony is open.
Paint and sealant at the slab edges.

How a railing replacement works
In South Florida, water gets into the slab around railing posts, reaches the steel inside and rusts it. The rust expands, the concrete cracks and spalls, and the railing loosens. Replacing the railing without repairing that concrete just restarts the clock.
Old railings are removed balcony by balcony, with the opening protected the whole time. Damaged concrete at the edge is cut out, the steel is treated or replaced, and the edge is rebuilt.
New railings are anchored to the repaired slab with the anchoring their product approval requires, with the posts sealed so water does not get back in.
Because the balcony is already open, many associations waterproof it at the same time.
What's in the price
Removal, concrete and railing in one contract.
The part that separates railing contractors
The cheapest bid swaps railings and leaves the cracked concrete. The new posts loosen in a few years, and the edge keeps spalling.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you build
Salt air corrodes metal, and water entering the slab around the posts rusts the steel inside the concrete. The concrete spalls, the anchors loosen and the railing becomes unsafe.
Aluminum picket railings are durable and affordable. Glass railings open the view and look more modern, at a higher cost. Both are available in powder-coated aluminum that resists salt air.
Yes. Height, opening size and the loads they resist are set by the code, and the product and its anchoring are approved for that use. Replacement railings are permitted and inspected.
The number of balconies, the railing system, and how much slab edge repair is needed. Concrete repair is often the unknown; the estimate shows it per balcony so it can be tracked.
Access to each balcony is needed for a short time. We schedule with the manager and give residents notice.
Powder-coated aluminum railings, anchored into repaired concrete and sealed at every post, last many years in salt air. What shortens their life is water getting back into the slab, which is why the sealing and the edge repair matter as much as the railing itself.
Railing replacement on an occupied building touches structure, concrete, waterproofing and every resident's balcony. Ask how the contractor handles the anchorage into the slab edge, how concrete damage found during removal is priced and how residents are kept off balconies while railings are out.
Ask to see similar buildings and ask what product approvals the railings carry. A railing that looks right but was not approved for the building's exposure is not a finished job.
Compare the same railing system, the same finish and the same scope at the slab edge. Some bids include concrete repair around the anchors and some do not, and on older Miami buildings that repair is often where the real work is.
Ask each bidder how they price concrete repair found once the old railings come off: by unit, by area or by a set allowance. Clear unit pricing protects the association from surprises in the middle of the project.
Salt air attacks metal finishes, fasteners and the point where the post meets the concrete. Aluminum with a durable factory finish and stainless fasteners is common in Miami because it resists corrosion better than steel, but the finish quality varies by product.
We show the board finish samples and explain how each is maintained. Rinsing railings with fresh water and checking the base of the posts at regular intervals extends their life, especially on the side of the building facing the water.
Yes. Many associations replace railings one elevation or one stack at a time, often over more than one budget year. Phasing works as long as the same system and finish are used throughout, so the building does not end up with two styles.
We order and document the product for the whole building, even if it is installed in phases, so the later phases match. Each phase is priced on its own, with its own schedule and resident notices.
A balcony without a railing cannot be used. Before any railing comes off, the balcony door is secured or residents are given clear notice that the balcony is closed, and temporary protection is placed where the building requires it.
We keep the time each balcony is open as short as possible: old railing out, edge repaired, new railing in. Residents get notice of their dates from management, and nobody is asked to guess when the balcony is safe again.
The product information for the railing system, the installation details, the finish specification and color code, the warranty information and a unit-by-unit list of where concrete repairs were made.
That record helps when an owner asks about their balcony, when an engineer inspects the building later or when a single railing panel needs to be replaced after damage. The association knows exactly what was installed and where.
Before you hire anyone
Yes, with the slab edge repaired first.
Yes, in aluminum frames rated for the use.
Yes. Spalled concrete and rusted steel are repaired before the new railing.
Yes. Permits are pulled and inspections closed.
Yes, and it is often the best time to do it.
Yes.
It depends on the number of balconies and the concrete repair. You get a schedule in writing.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.
One contractor
FF Builders is a Florida Certified General Contractor working across Miami-Dade and Broward. Design, structure, systems and finishes are one company, one contract and one person on the phone from the first visit to the final inspection.
Facade restoration · Balcony waterproofing · Concrete repair · Whole-building windows
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).