FF BuildersFF Builders
Renovated condo lobby with marble-look floor, wood front desk and glass entrance
Bal Harbour · Front desk stays open · Phased renovation

Condo lobby renovation
in Bal Harbour.

A Bal Harbour lobby never closes: the front desk, the valet and the entrance on Collins work every hour of the day. We renovate it in phases around them, with a written estimate within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

The lobby is the building's front door, and it is always staffed.

In the oceanfront towers along Collins Avenue, the lobby is where the doorman greets residents, the valet brings the cars around, packages arrive and guests wait. None of that stops for a renovation. At the visit we map how the lobby is used through the day, from the porte-cochere to the elevators to the beach-side exit, before we propose how to divide it.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We map the lobbyEntrances, front desk, package room, elevators, the route to the pool and beach, and where the staff works.
  3. You get the estimate in writing, within 24 hoursItemized by area, with the phases and the temporary front desk position written in.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we renovate in Bal Harbour

From the entrance
to the elevator doors.

Stone and tile floors

Marble, porcelain or stone, removed and set again over a flat bed.

Walls

Stone, wood paneling, wallcovering or plaster finishes.

Front desk

Built in place, with the power and data the staff needs.

Ceilings and lighting

Coves, fixtures and ceiling details.

Mail and package room

Shelving and finishes to match the lobby.

Entrance doors

Impact entrance doors on the street or beach side.

Crew finishing the walls of a tall condo lobby with stone floors

What is different in Bal Harbour

Half the lobby at a time,
the desk never moves out.

The lobby is split into phases so residents always have a clean way from the entrance to the elevators. While one side is under work behind a finished-looking partition, the other side carries the traffic. The front desk stays where it is for as long as it can, and when its own turn comes, a temporary desk is set up where the staff can still see the door and the elevators. The valet and the porte-cochere are never blocked by material or debris.

Deliveries and debris go through the service entrance and the loading area, at the hours the building sets, never across the front door. Stone is cut outside the lobby or behind dust control. Loud work is grouped into the hours the association allows, and the board knows ahead of time which days those are.

A lobby a few steps from the beach also takes sand and wet feet coming in from the pool and the beach exit, and salt air every time the doors open. Floor finishes are chosen for slip resistance where people walk in wet, and stone is sealed for it. If the lobby includes new entrance doors or glass, the Village permit covers that work, and the estimate tells you which parts need it.

What's in the price

A lobby that never
looks closed.

Residents and guests should be able to come home every day of the renovation without stepping around it.

  • Phase plan — which side is closed, and when
  • Temporary front desk — positioned with the staff
  • Service route — material and debris through the loading area only
  • Association package — certificate of insurance and building rules
  • Dust control — partitions and cutting kept out of the lobby
  • Permit — pulled with the Village where the scope needs it
  • Close-out — punch list walked with the board

The part that separates lobby contractors

The design is the easy part.
Keeping the door open is the job.

A lobby renovation in a Bal Harbour tower is judged every day it is under work, by residents, guests and staff. A plan that closes the front door, even for a week, is the wrong plan.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Will the lobby have to close?

No. The work is phased so residents always have a clean path from the entrance to the elevators, and the front desk keeps working.

Can you work with the interior designer the board hired?

Yes. We build to the designer's drawings and finishes, and price them in writing.

Where does the material come in?

Through the service entrance and loading area, at the hours the building allows.

Does a lobby renovation need a permit from the Village?

Much of it does, especially entrance doors, electrical and anything structural. Check with the Village for your scope; the permit is part of our price where it applies.

Can you work during the season?

Yes. The phase plan is built around the building's busiest months, and the board decides when the loudest phases happen.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured, with certificates for the association.

More in Bal Harbour

One contractor, unit or house.

FF Builders is a Florida Certified General Contractor working across Bal Harbour, from oceanfront condo units on Collins Avenue to the homes on the bay. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.

Condo lobby renovation · General contractor in Bal Harbour · Condo corridor renovation in Bal Harbour · Condo amenity renovation in Bal Harbour · Marble and stone in Bal Harbour · Condo lobby renovation in Surfside · Condo lobby renovation in Bay Harbor Islands · Condo lobby renovation in Miami Beach

Free in-home visit

A new lobby, with the front desk open the whole time.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.