FF BuildersFF Builders
Interior opened to the studs after selective demolition
Sunny Isles Beach · Older & new towers · Building rules

Interior demolition
in Sunny Isles Beach.

On Collins Avenue, a unit in an older building and a unit in a new tower come apart in very different ways. We plan the one you have, in writing within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

Two tear-outs on one street.

Sunny Isles Beach has towers of every age side by side. In a building from the 1960s to the 1980s, demolition uncovers layers: tile over tile, old ceilings, pipes that run through the slab. In a new tower, the first owner is often taking out the developer's finishes, over a waterproofing membrane and systems the building still covers. The visit starts by knowing which one you are in.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We look at the unit and the buildingWhat is on the floors, walls and ceilings, what has to stay, testing needs, and the building's rules for work hours, elevator and debris.
  3. You get the estimate in writing, within 24 hoursTesting, protection, demolition, debris removal, the association package and the permit, item by item.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we take out in Sunny Isles Beach

Only what has to go.

Kitchen or bath tear-outs

Cabinets, tile and fixtures removed down to what stays.

Full gut

A unit or house taken back to the shell.

Commercial strip-out

A shop or office on Collins or Sunny Isles Boulevard cleared for the next tenant.

Floor removal

Tile and stone removed without cracking the slab.

Ceiling removal

Old ceilings tested and taken down.

Wall removal

Walls taken out once the structure is known.

Interior framing exposed after demolition in a unit under renovation

What changes in Sunny Isles Beach

Old layers,
new membranes.

In an older building on Collins, we test before we break. Old ceilings, floor tile adhesive and some wall finishes can contain materials that must be handled by rules, and the only way to know is a test. Then we remove in layers. Tile set over older tile is common, and the slab under it may have pipes and conduits that were never drawn. We scan and open carefully where we expect them, and cast iron drain lines are looked at while the floor is open, because this is the moment to replace them.

In a new tower, the risk is the opposite: taking out too much. Under the bathroom tile there is usually a waterproofing membrane the building relies on to protect the unit below. Under the floor there may be an acoustic layer the association requires. Some systems are still covered by the developer. We remove the finishes you are replacing and protect what the building needs, and if a membrane has to be cut, it is replaced and tested before the new tile goes down.

In both, the building sets the rhythm. Work and noise happen in the hours the association allows, the service elevator is booked and padded, hallways are protected, and debris goes down in bags and bins that fit the elevator, never through a balcony. The certificate of insurance is on file before the first hammer.

What's in the price

The demolition,
test to clean slab.

One contract. Testing, protection, removal and hauling are the same company.

  • Testing — older finishes tested before anything is broken
  • Protection — elevator, hallways and the rooms that stay
  • Selective removal — only the finishes being replaced
  • Membrane care — protected, or replaced and tested when cut
  • Debris and hauling — bagged, taken down the service elevator and hauled
  • Association and permit — insurance certificate, building package and City permit

The part that separates demolition crews here

A leak from
a tear-out.

In a new tower, the classic mistake is a crew that tears out the bathroom down to the slab, membrane and all, and leaves the next leak for the unit below to find.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Do you test before demolition in an older building?

Yes. Older ceilings, adhesives and finishes are tested before anything is broken, and handled according to the results.

Will demolition damage the waterproofing in my new tower unit?

Not if it is planned. We protect the membrane, or replace and test it if it has to be cut.

How does debris leave the building?

In bags and bins that fit the service elevator, in the hours the association allows, with the elevator and hallways protected.

Can you demolish and then build the new space?

Yes. Demolition is usually the first phase of the renovation we build, under one contract.

How much does interior demolition cost?

It depends on the size, the testing and what has to stay. You get the price in writing within 24 hours of the visit.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Sunny Isles Beach

One contractor, tower or house.

FF Builders is a Florida Certified General Contractor working across Sunny Isles Beach, from the towers on Collins Avenue to the homes in Golden Shores. Kitchens, baths, floors, impact glass and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.

Interior demolition · General contractor in Sunny Isles Beach · Condo renovation in Sunny Isles Beach · Whole house gut renovation in Sunny Isles Beach · Shower waterproofing in Sunny Isles Beach · Interior demolition in Bal Harbour · Interior demolition in Surfside · Interior demolition in Bay Harbor Islands · Interior demolition in Aventura

Free in-home visit

A clean start, older tower or new.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.