FF BuildersFF Builders
FF Builders crew setting tile in a condo unit with a view of Biscayne Bay
Association package · Certificates · Permits · Building rules

Condo renovation approval
in Miami.

Most condo renovations wait on paperwork, not construction. We prepare what the association asks for, so the approval moves and the work starts on time.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

We read the building's rules first.

Every association has its own renovation rules: what needs approval, which documents, which hours, which deposits. The visit starts with those rules and your scope.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We read the rulesThe building's renovation requirements and your scope.
  3. You get the estimate in writing, within 24 hoursThe work, plus the approval package and the schedule the building allows.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we prepare

The package the board asks for.

Scope of work

A clear description of what will be done.

Drawings

Plans for layout, plumbing or structural changes.

License and insurance

Certificates naming the association as required.

Schedule

Start, duration and work hours.

Sound underlayment

Flooring specifications for the board.

Permit

Pulled once the association approves.

Condo kitchen under renovation with protected floors and a bay view

How condo approvals usually work

Approved first.
Then built by the rules.

Most associations require approval before any renovation that touches floors, walls, plumbing, electrical or structure. The board or the manager reviews the scope, the contractor's license and insurance, and sometimes drawings.

We prepare that package with the scope written clearly, the certificates the building requires, the flooring and sound specifications, and a realistic schedule.

Once approved, the permit is pulled and the work follows the building's rules: approved hours, elevator reservations, protection of common areas, and debris removed the way the building wants.

The approval process is shorter when the first submission is complete. Most delays come from missing documents.

What's in the price

Approval and construction,
one contractor.

The paperwork and the work in one contract.

  • Rules review — the building's renovation requirements
  • Approval package — scope, drawings and specifications
  • Certificates — license and insurance as required
  • Permit — pulled after approval
  • Building logistics — hours, elevator and protection
  • Close-out — inspections closed and the building informed

The part that separates condo contractors

Six weeks lost
to a missing certificate.

Approvals stall on small things: the wrong certificate holder, a missing flooring spec, an unclear scope. Each round trip costs weeks.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you build

Getting a condo renovation approved: what owners ask

What does a condo association need to approve?

It depends on the building, but usually any work affecting floors, walls, plumbing, electrical, windows, balconies or structure. Painting and furniture usually do not need approval. The building's renovation rules say exactly.

Which documents are usually requested?

A scope of work, the contractor's license, certificates of insurance naming the association, drawings for layout or structural changes, flooring and underlayment specifications, and a schedule. Some buildings also require a deposit.

How long does approval take?

It varies by building and board meeting schedule. A complete first submission is the single biggest factor in how fast it moves.

Do I also need a city permit?

Most renovations beyond cosmetic work need a permit in addition to the association's approval. The permit is usually pulled after the association approves.

What happens if work starts without approval?

Associations can stop the work, fine the owner and require changes. It is always cheaper to wait for approval.

What should the scope of work say?

Exactly what will change: rooms affected, finishes, plumbing and electrical changes, any wall or structural work, flooring and underlayment. A specific scope gets approved faster than a vague one, because the board has nothing to ask about.

What should I ask before hiring a contractor for a condo?

Ask whether they have worked in buildings with active associations and property managers, whether they can provide insurance certificates in the format the building asks for and whether they will follow the building's rules for hours, elevator use and debris.

Ask also who prepares the approval package and who talks to management. A contractor who has done this many times knows what boards usually ask for and saves weeks of back and forth.

Why do approvals get delayed?

Most delays come from incomplete packages: a scope that is too vague, insurance certificates without the right names, missing product data for flooring or windows, or drawings that do not show what is changing.

Other delays come from timing. Some boards review only at scheduled meetings. Submitting a complete package early, and asking management when the next review happens, is the simplest way to avoid losing a month.

What should the insurance certificate show?

Each building has its own requirements, usually listed in its renovation rules or given by management. They often ask that the association and the management company be named in a specific way on the certificate.

We request the exact wording from management and have the certificate issued to match. A certificate with the wrong names is one of the most common reasons a package is sent back.

Can the scope change after approval?

Small changes inside the approved scope usually do not need a new review. Changes that touch what the board reviewed, such as moving plumbing, changing flooring type or replacing windows, may need to go back for approval.

Whether a change needs approval is for the association and management to say, not the contractor. We check with management before making any change that affects what was submitted, so the owner is not exposed later.

How do I keep neighbors informed?

Management usually notifies neighbors through its own channels, but a short, polite note from the owner with dates and a contact helps. Neighbors above, below and next to the unit are the ones who hear the work.

We follow the building's work hours, protect the corridor and elevator and keep the noisiest work concentrated in as few days as possible. Neighbors who know what to expect complain far less.

What happens at the end of the work?

Many buildings ask for a final walk by management to check the common areas and confirm the work matches what was approved. If a permit was required, the final inspection also has to be passed.

We leave the corridor and elevator as we found them, meet any conditions management lists for the deposit and give the owner the product information and warranty documents for what was installed. The job is closed when both the building and the owner sign off.

Does the building ask for a deposit?

Some associations ask for a refundable deposit or a fee before work starts, to cover possible damage to common areas. The amount and the conditions are set by the building, and management tells you what applies.

The way to get it back is simple: protect the elevator and corridor every day, remove debris the way the building requires and leave the common areas as they were. We photograph the corridor and elevator before the first day, so the condition at the start is on record.

Before you hire anyone

The ones people actually ask.

Do you prepare the association approval package?

Yes. Scope, drawings, specifications, certificates and schedule.

Can you provide insurance certificates for my building?

Yes, with the association named as the building requires.

Do you pull the permit too?

Yes, after the association approves.

Do you follow building work hours?

Yes, along with elevator and protection rules.

Can you talk directly with the property manager?

Yes, with your authorization.

Can you help with flooring specifications?

Yes, including the sound underlayment the building requires.

How long until work can start?

It depends on the building's approval process. A complete package shortens it.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

One contractor

The whole project, one contractor.

FF Builders is a Florida Certified General Contractor working across Miami-Dade and Broward. Design, structure, systems and finishes are one company, one contract and one person on the phone from the first visit to the final inspection.

Condo renovation · Condo soundproof flooring · Renovation for owners abroad · Unit combination

Free in-home visit

Approved, then built right.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.