FF BuildersFF Builders
Renovated classroom with a new floor, LED ceiling lights and a full whiteboard wall
Miami Beach · Classrooms · Summer break

Private school renovation
in Miami Beach.

A school on Miami Beach has one summer to renovate, on a residential street on an island. We plan the work, the trucks and the neighbors before school lets out, and price it within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

Summer is short on an island.

Private schools here sit among homes in Mid-Beach, North Beach and South Beach, with families coming from the islands and across the causeways. The renovation window is the summer break, and everything that comes in or goes out has to cross a causeway and use streets where neighbors park. The visit happens in the spring, so the plan is ready on the last day of school.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We walk the campus in the springClassrooms, restrooms, ceilings, the street and where material can be staged.
  3. You get the estimate in writing, within 24 hoursRoom by room, with the summer schedule, deliveries, permits and what is finished by the first day.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we renovate in Miami Beach

Every room
back by the first bell.

Classrooms

Floors, ceilings, lighting, whiteboard walls and storage.

Restrooms

Fixtures, partitions and accessible stalls.

Hallways and common areas

Durable finishes that take a school year of traffic.

Offices and reception

A secure entry and a front office for parents.

Windows and openings

Impact windows and the concrete around them.

Painting

Classrooms and hallways, done while the building is empty.

Classroom stripped during summer break while a crew installs a new ceiling grid

What Miami Beach adds

A residential street,
a fixed deadline.

A school in a Miami Beach neighborhood does not have a loading dock and a parking lot to stage in. It has a street with homes on both sides, parking that residents use, and limited room at the curb. Dumpsters, deliveries and crew parking are planned with the school before the summer, so the work does not start the season with a complaint from the neighbors. Work hours follow what the city allows; check with the city for your street.

Material arrives over the causeways, and the summer is also the season when everyone else on the island is renovating. Ceiling grids, flooring, partitions and fixtures are ordered against the schedule in the spring, so nothing that has to be installed in July is still on a truck on the mainland. The rooms that must be ready for the first day go first.

Many school buildings here were built in the MiMo decades, with concrete and steel that have spent years in salt air. Opening a classroom ceiling or replacing a window can expose spalled concrete or rusting steel. We look for the signs at the visit and price the repair up front, so the summer schedule holds when the walls are opened.

What's in the price

Ready for students,
ready for parents.

A school renovation is finished when the inspection is closed and the rooms are clean before teachers come back.

  • Spring planning — scope, order dates and a summer schedule
  • Neighbor plan — dumpsters, deliveries and parking on the street
  • Material on time — ordered against the July and August work
  • Hidden conditions — concrete and steel checked before demolition
  • Finishes for traffic — floors and walls that take a school year
  • Permits and inspections — pulled, inspected and closed before the first day

What separates school contractors here

August does not move.

On Miami Beach a school renovation that starts in June without the deliveries and the street planned loses its first weeks. We plan in the spring so the summer is all work.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Can you finish a renovation over the summer break?

That is how we plan it. The visit is in the spring, material is ordered against the schedule and the rooms needed on the first day are done first.

How do you handle the neighbors and parking?

Dumpsters, deliveries and crew parking are planned with the school before work starts. Work hours follow what the city allows for your street.

Can you work during the school year?

For smaller jobs, yes. Work goes after hours, on weekends or during breaks, with the area closed off from students.

Who supplies the equipment?

Your supplier; we build the space ready for it. Smart boards, furniture, lab and kitchen equipment come from your vendors, with power, data and backing in place.

How much does a school renovation cost?

It depends on the number of rooms, the condition of the building and the finishes. You get a written estimate within 24 hours of the visit.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Miami Beach

One contractor, house or condo.

FF Builders is a Florida Certified General Contractor working across Miami Beach, from Art Deco buildings in South Beach to condo towers on Collins and homes on the islands. Kitchens, baths, windows, floors and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.

Private school renovation · General contractor in Miami Beach · Daycare build-out in Miami Beach · ADA upgrades in Miami Beach · Commercial build-out in Miami Beach · Private school renovation in Surfside · Private school renovation in Bay Harbor Islands · Private school renovation in Coral Gables

Free in-home visit

Your school, ready by the first day.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.